Back to all materials
AI-generated representative illustration of Clean Limestone, ¾ Inch / #57. Nominal ¾ inch clean angular stone.

AI-generated representative imagery. Actual color, size and texture vary by source. Request a current photo or sample before ordering.

Drainage & Utility Aggregate

Clean Limestone, ¾ Inch / #57

Clean Limestone, ¾ Inch / #57 for french drains, pipe-zone aggregate and drainage beds. Nominal ¾ inch clean angular stone. Confirm the source grade and your project requirements before ordering.

French drainsPipe-zone aggregateDrainage beds

Your delivered price

Let’s quote your project.

Material, quantity and jobsite ZIP determine your quote. Planning minimum: 2 tons. Freight and Texas tax are confirmed separately.

Request this material Calculate a planning quantity

Know the grade before you order.

Particle size / texture
Nominal ¾ inch clean angular stone
Planning unit
Tons, with cubic-yard planning support
Loose bulk density
Approximately 1.35 tons per cubic yard
What to confirm
A trade name is not a sieve certification. Match the approved gradation and filter fabric to the project.

Planning estimate for loose material. Moisture, compaction and source change actual weight. Nominal sizes and common trade names do not establish certification, current inventory or engineering acceptance.

Where it fits

  • French drains
  • Pipe-zone aggregate
  • Drainage beds

Questions before delivery

How much clean limestone, ¾ inch / #57 should I order?

Use the material calculator with your dimensions and depth. The loose planning density is approximately 1.35 tons per cubic yard. Confirm moisture, compaction allowance, source weight and the final order with dispatch.

Is the material shown the actual product available today?

The images are AI-generated representative illustrations. Natural color, particle size and texture vary. Request current source photos, samples and test reports where appearance or specification matters.

Does a quote or payment confirm my delivery date?

Dispatch confirms stock, equipment, site access and delivery timing manually. A request or payment does not automatically assign a truck or confirm a delivery date.

What do I need for an engineered or specified project?

A trade name is not a sieve certification. Match the approved gradation and filter fabric to the project.

Compare within the category